Start date | Project | acronym | role | funding | partners |
---|---|---|---|---|---|
2021-01-01 | From Prediction to Decision Support - Strengthening Safe and Scalable ATM Services through Automated Risk Analytics based on Operational Data from Aviation Stakeholders | SafeOPS | participant | 997.750 | 6 |
2021-01-01 | CONCEPT OF OPERATIONS FOR EUROPEAN U-SPACE SERVICES - EXTENSION FOR URBAN AIR MOBILITY | CORUS-XUAM | participant | 3.999.389 | 31 |
2021-01-01 | Virtual Centre | PJ32-W3 VC | participant | 5.579.565 | 32 |
2021-01-01 | PJ34-W3 AURA “ATM U-SPACE INTERFACE” | PJ34-W3 AURA | participant | 7.978.320 | 46 |
2021-01-01 | Flexible ATCO Endorsement and LDACS Complement | PJ33-W3 FALCO | participant | 5.315.207 | 29 |
2020-11-01 | ADS-C ENables and Supports Improved ATM Operations | PJ38-W3-ADSCENSIO | participant | 6.759.969 | 31 |
2020-10-01 | VLD1 Wave 2 Demonstration Of Runway Enhanced Approaches Made with Satellite Navigation | VLD1-W2 DREAMS | participant | 4.481.278 | 16 |
2019-12-01 | PJ.20 W2 Master Planning | PJ20-W2 AMPLE | participant | 2.088.795 | 35 |
2019-12-01 | Airport airside and runway throughput | PJ02-W2 AART | participant | 16.469.485 | 34 |
2019-12-01 | Integrated Communication, Navigation and Surveillance System | PJ14-W2 I-CNSS | participant | 18.529.379 | 29 |
2019-12-01 | Separation Management and Controller Tools | PJ10-W2 PROSA | coordinator | 20.057.736 | 28 |
2019-12-01 | Enable RPAS Insertion in Controlled Airspace | PJ13 - W2 ERICA | participant | 13.150.436 | 30 |
2019-12-01 | PJ05-W2 Digital Technologies for Tower | PJ05-W2 DTT | participant | 9.311.744 | 31 |
2019-12-01 | 4D Skyways | PJ18-W2 4D Skyways | participant | 18.345.076 | 27 |
2019-11-01 | PJ01 Wave 2 Enhanced Arrivals and Departures | PJ01-W2 EAD | participant | 7.806.582 | 24 |
2018-02-01 | Augmented Approaches to Land 2 | AAL2 | participant | 2.110.729 | 12 |
2018-01-01 | U-Space Initial Services | USIS | participant | 1.308.671 | 7 |
2017-09-01 | Concept of Operations for EuRopean UTM Systems | CORUS | participant | 800.000 | 9 |
2017-01-01 | Cross Border SESAR Trials for Enhanced Arrival Management | PJ25 XSTREAM | participant | 3.909.905 | 20 |
2016-12-01 | Integrated Surface Management | PJ03a SUMO | participant | 12.721.437 | 37 |
2016-11-01 | Flight Object Interoperability VLD Demonstration | PJ27 IOPVLD | coordinator | 1.233.047 | 13 |
2016-11-01 | Essential and Efficient Communication Navigation and Surveillance Integrated System | PJ14 EECNS | participant | 22.970.581 | 30 |
2016-11-01 | Content Integration | PJ19 CI | participant | 7.227.142 | 28 |
2016-11-01 | 4D Trajectory Management | PJ18 4DTM | participant | 22.193.941 | 28 |
2016-11-01 | SWIM Technical Infrastructure | PJ17 SWIM-TI | participant | 9.386.744 | 28 |
2016-11-01 | Remote Tower for Multiple Airports | PJ05 Remote Tower | participant | 9.013.121 | 31 |
2016-11-01 | Controller Tools and Team Organisation for the Provision of Separation in Air Traffic Management | PJ10 PROSA | coordinator | 26.388.519 | 29 |
2016-11-01 | Common Services | PJ15 COSER | participant | 5.349.617 | 18 |
2016-11-01 | Controller Working Position / Human Machine Interface - CWP/HMI | PJ16 CWP HMI | participant | 12.628.762 | 28 |
2016-11-01 | Airport Safety Nets | PJ03b SAFE | participant | 8.228.382 | 27 |
2016-11-01 | Master Plan Maintenance | PJ20 AMPLE | participant | 3.327.676 | 28 |
2016-11-01 | PJ24 VLD Network Collaborative Management | PJ24 NCM | participant | 3.760.702 | 19 |
2016-11-01 | Enhanced Arrivals and Departures | PJ01 EAD | participant | 16.934.064 | 24 |
2016-11-01 | Advanced Airspace Management | PJ08 AAM | participant | 2.738.349 | 20 |
2016-09-01 | Initial Trajectory Information Sharing | PJ31 DIGITS | participant | 18.955.106 | 17 |
2012-06-01 | Unmanned Aerial Systems in European Airspace | ULTRA | participant | 597.417 | 12 |