2020 | |
---|---|
Criterium: | Position: |
Overall Score: | > 1000 |
Total Project Funding per Partner: | > 1000 |
Total Number of Projects: | > 1000 |
2019 | |
Criterium: | Position: |
Overall Score: | > 1000 |
Total Project Funding per Partner: | > 1000 |
Total Number of Projects: | > 1000 |
2012 | |
Criterium: | Position: |
Overall Score: | 900-1000 |
Networking Rank (Reputation): | > 1000 |
Networking Rank (Reputation): | > 1000 |
2011 | |
Criterium: | Position: |
Overall Score: | > 1000 |
Networking Rank (Reputation): | > 1000 |
Total number of projects: 6
As coordinator: 1
As participant: 5
Sole participant: 0
Coordinator / Participant Ratio: 0.2*
Total project funding [€]: | Projects [No]: | |||||
---|---|---|---|---|---|---|
Year: | coordinator* | participant* | per partner | as coordinator | as participant | |
2020 | 0 | 3.455.024 | 482.007 | 1 | ||
2019 | 1.009.345 | 0 | 538.530 | 1 | ||
2013 | 0 | 3.333.275 | 277.773 | 1 | ||
2012 | 0 | 7.186.998 | 719.271 | 2 | ||
2011 | 0 | 1.087.900 | 181.231 | 1 |
Total number of partners: 37
Partner loyalty:
Frequent Partner: (> 2 projects): 0
Rare Partner: 37
Frequent / Rare Partner Ratio: 0
Start date | Project | acronym | role | funding | partners |
---|---|---|---|---|---|
2020-06-01 | Electro-mechanical magnetic blade pitch control | ROTATOR | participant | 3.455.024 | 4 |
2019-10-01 | Measurement and Analysis of Generator bearing Loads and Efficiency with Validation | MAGLEV | coordinator | 1.009.345 | 2 |
2013-08-01 | Demonstration of methods and tools for the optimisation of operational reliability of large-scale industrial wind turbines | OPTIMUS | participant | 3.333.275 | 12 |
2012-11-01 | Industrialization of a 3 MW Medium-Speed Brushless DFIG Drivetrain for Wind Turbine Applications | WINDRIVE | participant | 1.586.998 | 7 |
2012-07-01 | Optimized electric Drivetrain by INtegration | ODIN | participant | 5.600.000 | 9 |
2011-10-01 | Development of an intelligent condition monitoring system for application on critical rotating components of industrial-scale wind turbines | INTELWIND | participant | 1.087.900 | 9 |