2020 | |
---|---|
Criterium: | Position: |
Overall Score: | > 1000 |
Total Project Funding per Partner: | > 1000 |
Total Number of Projects: | > 1000 |
2019 | |
Criterium: | Position: |
Overall Score: | > 1000 |
Total Project Funding per Partner: | > 1000 |
Total Number of Projects: | > 1000 |
2015 | |
Criterium: | Position: |
Overall Score: | > 1000 |
Networking Rank (Reputation): | > 1000 |
Total number of projects: 5
As coordinator: 0
As participant: 5
Sole participant: 0
Coordinator / Participant Ratio: 0*
Total project funding [€]: | Projects [No]: | |||||
---|---|---|---|---|---|---|
Year: | coordinator* | participant* | per partner | as coordinator | as participant | |
2020 | 0 | 2.731.878 | 453.775 | 1 | ||
2019 | 0 | 1.999.843 | 621.225 | 2 | ||
2017 | 0 | 511.339 | 154.250 | 1 | ||
2015 | 0 | 5.277.598 | 340.000 | 1 |
Total number of partners: 27
Partner loyalty:
Frequent Partner: (> 2 projects): 0
Rare Partner: 27
Frequent / Rare Partner Ratio: 0
Start date | Project | acronym | role | funding | partners |
---|---|---|---|---|---|
2020-07-01 | Core noIse Reduction foR Uhbr engineS | CIRRUS | participant | 2.731.878 | 8 |
2019-11-01 | Part distortion prediction, design for minimized distortion, additive manufactured polymer aerospace parts | PADICTON | participant | 749.968 | 4 |
2019-10-01 | Thermoplastic material allowable generation using a reliability-based virtual modeling platform | TREAL | participant | 1.249.875 | 3 |
2017-06-01 | Predictive Simulation of Defects in Structural Composites | PSIDESC | participant | 511.339 | 3 |
2015-09-01 | EXTREME Dynamic Loading - Pushing the Boundaries of Aerospace Composite Material Structures | EXTREME | participant | 5.277.598 | 14 |