BOMBARDIER INC. -  

Ranking results:

Past rankings:

2020
Criterium:Position:
Overall Score:300-400
Total Project Funding per Partner:300-400
Total Number of Projects:300-400
2019
Criterium:Position:
Overall Score:300-400
Total Project Funding per Partner:200-300
Total Number of Projects:300-400
2015
Criterium:Position:
Overall Score:> 1000
Networking Rank (Reputation):> 1000

Ranking timeline:

Project Participation Performance(2015-01-01 - 2024-12-31 ):

Total Project Funding:

Funding per Partner:

Projects:

Leadership:

Total number of projects: 43
As coordinator: 4
As participant: 39
Sole participant: 0
Coordinator / Participant Ratio: 0.1*

Summary:

Total project funding [€]:Projects [No]:
Year:coordinator*participant*per partner  as coordinatoras participant
2023 0 18.756.594 500.000 2
2022 0 99.585.664 0 3
2020 0 37.501.969 2.099.564 5
2019 0 87.545.263 5.329.364 9
2018 5.461.568 34.975.902 4.064.949 1 4
2017 7.746.802 27.191.668 0 1 5
2016 2.840.738 52.517.528 0 2 8
2015 0 41.073.353 0 3

Networking:

Partners:

Institution:Projects [No]:
ALSTOM19
SIEMENS18
DEUTSCHE BAHN17
CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES S A16
DEUTSCHES ZENTRUM FUR LUFT UND RAUMFAHRT EV14
TRAFIKVERKET TRV14
HITACHI RAIL STS13
INDRA SISTEMAS S A11
SOCIETE NATIONALE SNCF11
ASOCIACION CENTRO TECNOLOGICO CEIT9
HACON INGENIEURGESELLSCHAFT MBH9
MER MEC9
CAF SIGNALLING SL8
NETWORK RAIL INFRASTRUCTURE LIMITED8
RAILENIUM8
SNCF RESEAU8
VIRTUAL VEHICLE RESEARCH8
AZD PRAHA SRO7
KNORR BREMSE SYSTEME FUER SCHIENENFAHRZEUGE7
KUNGLIGA TEKNISKA HOEGSKOLAN7
THALES7
TECHNISCHE UNIVERSITEIT DELFT6
DB NETZ5
FAIVELEY TRANSPORT ITALY S P A5
FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E V5
OBBINFRASTRUKTUR5
PATENTES TALGO SL5
AUSTRIAN RESEARCH CENTERS SIEBERDORF4
GTS DEUTSCHLAND4
POLSKIE KOLEJE PANSTWOWE SPOLKA AKCYJNA4
RETE FERROVIARIA ITALIANA4
RISE RESEARCH INSTITUTES OF SWEDEN AB4
SCHWEIZERISCHE BUNDESBAHNEN SBB4
SNCF VOYAGEURS4
UNION INTERNATIONALE DES CHEMINS DE FER4
ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS3
AIRBUS FRANCE SAS3
CAF TURNKEY & ENGINEERING SOCIEDAD LIMITADA3
CENTRO DE ESTUDIOS DE MATERIALES Y CONTROL DE OBRA3
CENTRO DE ESTUDIOS Y EXPERIMENTACION DE OBRAS PUBLICAS3
CHALMERS UNIVERSITY OF TECHNOLOGY3
DB SYSTEMTECHNIK3
ENCLAVAMIENTOS Y SENALIZACION FERROVIARIA ENYSE3
FAIVELEY TRANSPORT SAS3
FEDERAL STATE UNITARY ENTERPRISE THE CENTRAL AEROHYDRODYNAMIC INSTITUTE NAMED AFTER PROF N E ZHUKOVSKY3
FERROVIE DELLO STATO ITALIANE3
INGENIERIA Y ECONOMIA DEL TRANSPORTE SME MP3
KONTRON TRANSPORTATION AUSTRIA3
MER MEC STE3
NORWEGIAN RAILWAY DIRECTORATE3
OFFICE NATIONAL D'ETUDES ET DE RECHERCHES AEROSPATIALES3
PKP INFORMATYKA SP ZOO3
PRORAIL BV3
RENFE OPERADORA3
SWEDISH NATIONAL ROAD AND TRANSPORT RESEARCH INSTITUTE3
AC2T RESEARCH2
AKADEMIA GORNICZOHUTNICZA IM STANISLAWA W KRAKOWIE2
ALSTOM TRANSPORTATION GERMANY2
CAF POWER & AUTOMATION SL2
CENTRO DE ENSAYOS Y ANALISIS CETEST SL2
CENTRUM NAUKOWO TECHNICZNE KOLEJNICTWA2
CFS ENGINEERING2
COFREN2
CONTRAFFIC2
DB REGIO2
FAIVELEY TRANSPORT LEIPZIG GMBH & CO KG2
FAIVELEY TRANSPORT NSF2
FEDERALNOE GOSUDARSTVENNOE UNITARNOE PREDPRIYATIE CENTRALNII INSTITUTAVIACIONOGO MOTOROSTROENIYA IMENI PI BARANOVA2
FOKKER AEROSTRUCTURES BV2
GEIE DES UTILISATEURS D'ERTMS2
GTS FRANCE SAS2
GTSPT GROUND TRANSPORTATION SYSTEMS PORTUGAL2
INDRA FACTORIA TECNOLOGICA SL2
KEWORKS BV2
KNORRBREMSE ESPANA2
KNORRBREMSE GESELLSCHAFT MIT BESCHRANKTER HAFTUNG2
KNORRBREMSE VASUTI JARMU RENDSZEREK HUNGARIA KORLATOLT FELELOSSEGU TARSASAG2
KONTRON TRANSPORTATION2
KONTRON TRANSPORTATION DEUTSCHLANDGMBH2
LEONARDO SOCIETA PER AZIONI2
LINKOPINGS UNIVERSITET2
LUND UNIVERSITY2
MATERIALS CENTER LEOBEN FORSCHUNG2
NORGES TEKNISKNATURVITENSKAPELIGE UNIVERSITET NTNU2
NS REIZIGERS BV2
ORANGE2
POLITECNICO DI TORINO2
REVENUE COLLECTION SYSTEMS FRANCE SAS2
RHEINISCH WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN2
SIEC BADAWCZA LUKASIEWICZ POZNANSKI INSTYTUT TECHNOLOGICZNY2
SLOVENSKE ZELEZNICE DOO2
STICHTING NATIONAAL LUCHT EN RUIMTEVAARTLABORATORIUM2
STIFTELSEN SINTEF2
TRENITALIA2
UNIVERSITEIT TWENTE2
VOESTALPINE DIGITAL TRACKMANAGEMENT2
VOESTALPINE RAILWAY SYSTEMS2
ABB1
ACCIONA1
ADVANCED PACKAGING CENTER BV1

Constancy:

Total number of partners: 684
Partner loyalty:
Frequent Partner: (> 2 projects): 351
Rare Partner: 333
Frequent / Rare Partner Ratio: 1.05

Project overview:

Start dateProjectacronymrolefundingpartners
2023-01-01Electric Vehicles Point Location Optimisation via Vehicular Communications EVOLVEparticipant423.20016
2023-01-01Digitalization of Power Electronic Applications within Key Technology Value Chains PowerizeDparticipant18.333.39463
2022-12-01Europe’s Rail Flagship Project 3 - Holistic and Integrated Asset Management for Europe’s RAIL System FP3 - IAM4RAILparticipant46.225.68994
2022-12-01Europe’s Rail Flagship Project 1 - MObility managemenT multImodal envirOnment aNd digitAl enabLers FP1 - MOTIONALparticipant37.875.97389
2022-12-01Europe’s Rail Flagship Project 6 - Delivering Innovative rail services to revitalise capillary lines and Regional rail services FP6 - FutuReparticipant15.484.00150
2020-12-01Extending the attractiveness of transport for end user and extending IP4 to SaaS solutions. ExtenSiveparticipant5.025.51316
2020-12-01SYSTEM ARCHITECTURE AND CONCEPTUAL DATA MODEL FOR RAILWAY, COMMON DATA DICTIONARY AND GLOBAL SYSTEM MODELLING SPECIFICATIONS LINX4RAIL2participant1.401.12923
2020-12-01Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security X2Rail-5participant14.844.16738
2020-12-01IP1 Traction TD1– Phase 3 and HVAC TD8 PINTA3participant8.583.80419
2020-05-01Verification and Validation of Automated Systems' Safety and Security VALU3Sparticipant7.647.35742
2019-12-01System architecture and Conceptual Data Model for railway, common data dictionary and global system modelling specifications LINX4RAILparticipant2.155.09216
2019-12-01Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail FINE-2participant3.635.17514
2019-12-01Intelligent Innovative Smart Maintenance of Assets by integRated Technologies 2 IN2SMART2participant10.241.02421
2019-12-01Advanced signalling and automation system - Completion of activities for enhanced automation systems, train integrity, traffic management evolution and smart object controllers X2Rail-4participant17.900.87320
2019-10-01Performance Improvement for Vehicles on Track 2 PIVOT2participant17.845.06216
2019-09-01Smart data-based assets and efficient rail freight operation FR8RAIL IIIparticipant5.804.57614
2019-09-01AGILE 4.0: Towards cyber-physical collaborative aircraft development AGILE 4.0participant4.499.67018
2019-06-01VertIcal demos over Common large scale field Trials fOr Rail, energy and media Industries 5G-VICTORIparticipant13.499.49127
2019-01-01Creating the next generation of 3D simulation means for icing ICE GENESISparticipant11.964.30033
2018-12-01Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication X2Rail-3participant17.166.48719
2018-10-01CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2. CONNECTA-2participant4.305.1796
2018-09-01IP1 Traction TD1 and Brakes TD5 – Phase 2 PINTA2participant12.680.59110
2018-09-01Smart Planning and Virtual Certification PLASA-2participant823.6447
2018-05-01Digitalization and Automation of Freight Rail FR8RAIL IIcoordinator5.461.56817
2017-10-01Performance Improvement for Vehicles on Track PIVOTcoordinator7.746.80217
2017-09-01Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 2 IMPACT-2participant3.153.65314
2017-09-01Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions X2RAIL-2participant13.399.91719
2017-09-01Real time information applications and energy efficient solutions for rail freight FR8HUBparticipant4.400.00014
2017-09-01COHErent Setup and Demonstration of Integrated Travel SerVices COHESIVEparticipant1.795.1506
2017-04-01MegaModelling at Runtime - scalable model-based framework for continuous development and runtime validation of complex systems. MegaMaRt2participant4.442.94929
2016-09-01Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 1 IMPACT-1participant299.9527
2016-09-01Future Improvement for Energy and Noise FINE 1coordinator1.340.88010
2016-09-01Automated Rail Cargo Consortium: Rail freight automation research activities to boost levels of quality, efficiency and cost effectiveness in all areas of rail freight operations ARCCparticipant1.600.0005
2016-09-01IP1 Traction TD1 and Brakes TD5 – Phase 1 PINTAparticipant12.823.2449
2016-09-01Future Freight Loco for Europe FFL4Ecoordinator1.499.8587
2016-09-01Start-up activities for Advanced Signalling and Automation Systems X2Rail-1participant18.292.47320
2016-09-01CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. CONNECTAparticipant5.477.5209
2016-09-01Intelligent Innovative Smart Maintenance of Assets by integRated Technologies IN2SMARTparticipant7.290.63323
2016-09-01Development of Functional Requirements for Sustainable and Attractive European Rail Freight FR8RAILparticipant3.478.22318
2016-02-01Satellite Technology for Advanced Railway Signalling STARSparticipant3.255.48517
2015-06-01Aircraft 3rd Generation MDO for Innovative Collaboration of Heterogeneous Teams of Experts AGILEparticipant7.074.80721
2015-05-01Innovative Intelligent Rail IN2RAILparticipant17.998.54654
2015-05-01NEW DEPENDABLE ROLLING STOCK FOR A MORE SUSTAINABLE, INTELLIGENT AND COMFORTABLE RAIL TRANSPORT IN EUROPE ROLL2RAILparticipant16.000.00031

Alias institution names:

  • BOMBARDIER INC
  • BOMBARDIER TRANSPORTATION
  • BOMBARDIER TRANSPORTATION SWEDEN AB
  • BOMBARDIER TRANSPORTATION UK