
| 2020 | |
|---|---|
| Criterium: | Position: |
| Overall Score: | > 1000 |
| Total Project Funding per Partner: | > 1000 |
| Total Number of Projects: | > 1000 |
| 2019 | |
| Criterium: | Position: |
| Overall Score: | > 1000 |
| Total Project Funding per Partner: | > 1000 |
| Total Number of Projects: | > 1000 |
| 2015 | |
| Criterium: | Position: |
| Overall Score: | > 1000 |
| Networking Rank (Reputation): | > 1000 |
Total number of projects: 8
As coordinator: 3
As participant: 5
Sole participant: 0
Coordinator / Participant Ratio: 0.6*
| Total project funding [€]: | Projects [No]: | |||||
|---|---|---|---|---|---|---|
| Year: | coordinator* | participant* | per partner | as coordinator | as participant | |
| 2023 | 0 | 4.829.773 | 217.938 | 1 | ||
| 2021 | 1.399.575 | 799.731 | 542.106 | 1 | 1 | |
| 2020 | 0 | 7.998.719 | 66.150 | 1 | ||
| 2019 | 2.499.672 | 0 | 665.350 | 1 | ||
| 2018 | 0 | 160.974.884 | 377.377 | 1 | ||
| 2017 | 0 | 499.719 | 149.957 | 1 | ||
| 2015 | 282.800 | 0 | 196.000 | 1 | ||
Total number of partners: 119
Partner loyalty:
Frequent Partner: (> 2 projects): 7
Rare Partner: 112
Frequent / Rare Partner Ratio: 0.06
| Start date | Project | acronym | role | funding | partners |
|---|---|---|---|---|---|
| 2023-01-01 | Climate Neutral and Digitalized Laser Based Surface Functionalization of Parts with Complex Geometry | CLASCO | participant | 4.829.773 | 13 |
| 2021-01-01 | Welding Equipment for optimised, fast and accurate LongituDinal barrEl joint closuRe | WELDER | coordinator | 1.399.575 | 4 |
| 2021-01-01 | REsearch on ThermoPlastic repAIRs | RETPAIR | participant | 799.731 | 3 |
| 2020-06-01 | Create and Harvest Offerings to support Manufacturing SMEs to become Digital Twin Champions | Change2Twin | participant | 7.998.719 | 21 |
| 2019-03-01 | Multifunctional automation system for Fuselage Assembly Line | MultiFAL | coordinator | 2.499.672 | 3 |
| 2018-01-01 | AIRFRAME ITD | GAM AIR 2018 | participant | 160.974.884 | 79 |
| 2017-02-01 | Assembly Planning and SIMulation of an Aircraft Final Assembly Line | SIMFAL | participant | 499.719 | 2 |
| 2015-07-01 | Electrical Starter / Generator disconnect system | StaGeDiS | coordinator | 282.800 | 2 |