
Total funding allocated to projects this organisation participated or coordinated
Total funding / No of participants
Total number of projects: 4
As coordinator: 0
As participant: 4
Sole participant: 0
Coordinator / Participant Ratio: 0*
*Ratio includes only projects with > 2 partners
| Total project funding [€]: | Projects [No]: | |||||
|---|---|---|---|---|---|---|
| Year: | coordinator* | participant* | per partner | as coordinator | as participant | |
| 2003 | 0 | 560.693 | 186.898 | 1 | ||
| 2006 | 0 | 391.661 | 130.554 | 1 | ||
| 2007 | 0 | 4.596.288 | 441.664 | 2 | ||
Total number of partners:386
Partner loyalty:
Frequent Partner: (> 2 projects): 88
Rare Partner: 298
Frequent / Rare Partner Ratio: 0.3
| Category: | No: |
|---|---|
| INDUSTRY AND TECHNOLOGY | 20 |
| SOCIAL AND ECONOMIC CONCERNS | 13 |
| ENERGY | 8 |
| RTD HORIZONTAL TOPICS | 8 |
| PHYSICAL AND EXACT SCIENCES | 1 |
| Start date | Project | acronym | role | funding | partners |
|---|---|---|---|---|---|
| 2007-07-01 | Prediction and monitoring of subsidence hazards above coal mines | PRESIDENCE | participant | 2.620.118 | 10 |
| 2007-07-01 | Increased productivity and safety of European coalmines by advanced techniques and planning tools enabling an improved strata control of the face-roadway junction | PROSAFECOAL | participant | 1.976.170 | 11 |
| 2006-09-01 | Cost efficient metallurgy for the production of novel ultra high strength deep drawable steel grades with high Mn contents from 10 to 25 wt.-% by using EAF steel making route | EAF-PROMS | participant | 391.661 | 3 |
| 2003-09-01 | Cost efficient metallurgy for the production of novel ultra high strength deep drawable steel grades with high Mn contents from 10 to 25 wt.-% | PROMS | participant | 560.693 | 3 |