Total number of projects: 7
As coordinator: 4
As participant: 3
Sole participant: 0
Coordinator / Participant Ratio: 1.33*
Total project funding [€]: | Projects [No]: | |||||
---|---|---|---|---|---|---|
Year: | coordinator* | participant* | per partner | as coordinator | as participant | |
2014 | 364.924 | 656.055 | 283.451 | 1 | 1 | |
2013 | 715.539 | 0 | 463.975 | 2 | ||
2012 | 0 | 3.110.407 | 277.935 | 2 | ||
2011 | 447.644 | 0 | 125.472 | 1 |
Total number of partners: 106
Partner loyalty:
Frequent Partner: (> 2 projects): 3
Rare Partner: 103
Frequent / Rare Partner Ratio: 0.03
Start date | Project | acronym | role | funding | partners |
---|---|---|---|---|---|
2014-06-16 | Advanced dEsign and testing of a polArimetric X-banD antenna for avionic weather radar | AHEAD | coordinator | 364.924 | 3 |
2014-01-01 | Avionic X-band Weather signal modeling and processing vALidation through real Data acquisition and analysis | X-WALD | participant | 656.055 | 4 |
2013-11-01 | in flight Trajectory optimizAtion through advanCed simulation TechnICs | TACTIC | coordinator | 300.221 | 2 |
2013-05-06 | Aircraft lightning thtRreat Reduction thrOugh Wiring optimization | ARROW | coordinator | 415.318 | 4 |
2012-10-01 | Operational Radar For Every drill string Under the Street | ORFEUS | participant | 2.536.767 | 11 |
2012-02-01 | Tilt Rotor ATM Integrated Validation of Environmental Low Noise Procedures | TRAVEL | participant | 573.640 | 2 |
2011-04-11 | CLEaner OPerations Attained Through Radars' Advance | CLEOPATRA | coordinator | 447.644 | 4 |