| next >> |
Start date | Project | acronym | role | funding | partners |
---|
2023-01-01 | European Bus Rapid Transit of 2030: electrified, automated, connected |
EBRT2030 | participant | 22.776.214 | 45 |
2022-12-01 | Europe’s Rail Flagship Project 4 - Sustainable and green rail systems |
FP4 - Rail4EARTH | coordinator | 38.386.394 | 71 |
2022-12-01 | Europe’s Rail Flagship Project 3 - Holistic and Integrated Asset Management for Europe’s RAIL System |
FP3 - IAM4RAIL | participant | 46.225.689 | 94 |
2022-12-01 | Europe’s Rail Flagship Project 1 - MObility managemenT multImodal envirOnment aNd digitAl enabLers |
FP1 - MOTIONAL | participant | 37.875.973 | 89 |
2022-12-01 | Europe’s Rail Flagship Project 6 - Delivering Innovative rail services to revitalise capillary lines and Regional rail services |
FP6 - FutuRe | participant | 15.484.001 | 50 |
2022-12-01 | Europe’s Rail Flagship Project 6 - Delivering Innovative rail services to revitalise capillary lines and Regional rail services |
FP6 - FutuRe | participant | 15.484.001 | 50 |
2021-01-01 | Standard-Sized Heavy-duty Hydrogen |
StasHH | participant | 7.500.000 | 33 |
2020-12-01 | Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security |
X2Rail-5 | participant | 14.844.167 | 38 |
2020-12-01 | Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security |
X2Rail-5 | participant | 14.844.167 | 38 |
2020-12-01 | IP1 Traction TD1– Phase 3 and HVAC TD8 |
PINTA3 | coordinator | 8.583.804 | 19 |
2020-12-01 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3 |
CONNECTA-3 | participant | 3.945.623 | 14 |
2020-12-01 | Extending the attractiveness of transport for end user and extending IP4 to SaaS solutions. |
ExtenSive | participant | 5.025.513 | 16 |
2020-12-01 | Technologies for Autonomous Rail Operation |
TAURO | participant | 1.955.261 | 24 |
2020-12-01 | Technologies for Autonomous Rail Operation |
TAURO | participant | 1.955.261 | 24 |
2020-12-01 | SYSTEM ARCHITECTURE AND CONCEPTUAL DATA MODEL FOR RAILWAY, COMMON DATA DICTIONARY AND GLOBAL SYSTEM MODELLING SPECIFICATIONS |
LINX4RAIL2 | participant | 1.401.129 | 23 |
2020-12-01 | SYSTEM ARCHITECTURE AND CONCEPTUAL DATA MODEL FOR RAILWAY, COMMON DATA DICTIONARY AND GLOBAL SYSTEM MODELLING SPECIFICATIONS |
LINX4RAIL2 | participant | 1.401.129 | 23 |
2020-11-01 | 5G for future RAILway mobile communication system |
5GRAIL | participant | 9.994.713 | 29 |
2020-11-01 | 5G for future RAILway mobile communication system |
5GRAIL | participant | 9.994.713 | 29 |
2019-12-01 | Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail |
FINE-2 | participant | 3.635.175 | 14 |
2019-12-01 | Advanced signalling and automation system - Completion of activities for enhanced automation systems, train integrity, traffic management evolution and smart object controllers |
X2Rail-4 | coordinator | 17.900.873 | 20 |
2019-12-01 | System architecture and Conceptual Data Model for railway, common data dictionary and global system modelling specifications |
LINX4RAIL | participant | 2.155.092 | 16 |
2019-10-01 | Performance Improvement for Vehicles on Track 2 |
PIVOT2 | participant | 17.845.062 | 16 |
2018-12-01 | Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication |
X2Rail-3 | participant | 17.166.487 | 19 |
2018-11-01 | Safe and effective HumAn-Robot coopEration toWards a better cOmpetiveness on cuRrent automation lacK manufacturing processes. |
SHAREWORK | participant | 7.351.468 | 16 |
2018-10-01 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2. |
CONNECTA-2 | participant | 4.305.179 | 6 |
2018-09-01 | IP1 Traction TD1 and Brakes TD5 – Phase 2 |
PINTA2 | coordinator | 12.680.591 | 10 |
2018-05-01 | Next Generation 12+MW Rated, Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity |
ReaLCoE | participant | 24.838.258 | 15 |
2017-10-01 | Performance Improvement for Vehicles on Track |
PIVOT | participant | 7.746.802 | 17 |
2017-10-01 | fASt and Smart charging solutions for full size URban hEavy Duty applications |
ASSURED | participant | 18.657.433 | 41 |
2017-09-01 | Innovative Solutions in Future Stations, Energy Metering and Power Supply |
IN2STEMPO | participant | 5.972.727 | 19 |
2017-09-01 | Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions |
X2RAIL-2 | participant | 13.399.917 | 19 |
2016-10-01 | Modular laser based additive manufacturing platform for large scale industrial applications |
MAESTRO | participant | 3.995.905 | 10 |
2016-09-01 | Start-up activities for Advanced Signalling and Automation Systems |
X2Rail-1 | participant | 18.292.473 | 20 |
2016-09-01 | Future Improvement for Energy and Noise |
FINE 1 | participant | 1.340.880 | 10 |
2016-09-01 | IP1 Traction TD1 and Brakes TD5 – Phase 1 |
PINTA | coordinator | 12.823.244 | 9 |
2016-09-01 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. |
CONNECTA | participant | 5.477.520 | 9 |
2016-04-01 | Architecture-driven, Multi-concern and Seamless Assurance and Certification of Cyber-Physical Systems |
AMASS | participant | 6.178.243 | 33 |
2016-04-01 | Graphene-based disruptive technologies |
GrapheneCore1 | participant | 89.000.000 | 186 |
2016-02-01 | Satellite Technology for Advanced Railway Signalling |
STARS | participant | 3.255.485 | 17 |
2015-11-01 | Operational Planning Tool Interfacing Manufacturing Integrated Simulations with Empirical Data |
OPTIMISED | participant | 7.012.637 | 11 |
2015-11-01 | Factories of the Future Resources, Technology, Infrastructure and Services for Simulation and Modelling 2 |
Fortissimo 2 | participant | 9.999.776 | 39 |
2015-09-01 | Movement Assisting Devices: Manufacturing of personalized Kineto-Dynamics parts and products for workers, elderly and children |
MovAiD | participant | 5.136.875 | 13 |
2015-09-01 | Turning waste from steel industry into a valuable low cost feedstock for energy intensive industry |
RESLAG | participant | 8.022.007 | 23 |
2015-08-01 | AUTomotive deRivative Energy system |
AutoRE | coordinator | 3.496.947 | 9 |
2015-06-01 | AErial RObotic system integrating multiple ARMS and advanced manipulation capabilities for inspection and maintenance |
AEROARMS | participant | 4.722.852 | 10 |
2015-06-01 | Predictable Flexible Molten Salts Solar Power Plant |
PreFlexMS | coordinator | 14.362.193 | 14 |
2015-06-01 | Predictable Flexible Molten Salts Solar Power Plant |
PreFlexMS | participant | 14.362.193 | 14 |
2015-05-01 | CO2 capture from cement production |
CEMCAP | participant | 8.778.701 | 15 |
2015-05-01 | CO2 capture from cement production |
CEMCAP | participant | 8.778.701 | 15 |
2015-05-01 | NEW DEPENDABLE ROLLING STOCK FOR A MORE SUSTAINABLE, INTELLIGENT AND COMFORTABLE RAIL TRANSPORT IN EUROPE |
ROLL2RAIL | participant | 16.000.000 | 31 |
| next >> |