| next >> |
Start date | Project | acronym | role | funding | partners |
---|
2022-12-01 | Europe’s Rail Flagship Project 4 - Sustainable and green rail systems |
FP4 - Rail4EARTH | participant | 38.386.394 | 71 |
2022-12-01 | Europe’s Rail Flagship Project 3 - Holistic and Integrated Asset Management for Europe’s RAIL System |
FP3 - IAM4RAIL | participant | 46.225.689 | 94 |
2022-12-01 | Europe’s Rail Flagship Project 1 - MObility managemenT multImodal envirOnment aNd digitAl enabLers |
FP1 - MOTIONAL | participant | 37.875.973 | 89 |
2020-12-01 | Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security |
X2Rail-5 | participant | 14.844.167 | 38 |
2020-12-01 | IP1 Traction TD1– Phase 3 and HVAC TD8 |
PINTA3 | participant | 8.583.804 | 19 |
2020-12-01 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3 |
CONNECTA-3 | participant | 3.945.623 | 14 |
2020-12-01 | Technologies for Autonomous Rail Operation |
TAURO | participant | 1.955.261 | 24 |
2020-12-01 | SYSTEM ARCHITECTURE AND CONCEPTUAL DATA MODEL FOR RAILWAY, COMMON DATA DICTIONARY AND GLOBAL SYSTEM MODELLING SPECIFICATIONS |
LINX4RAIL2 | participant | 1.401.129 | 23 |
2020-07-01 | Use-centric rail freight innovation for Single European Railway Area. |
FR8RAIL IV | participant | 7.792.678 | 27 |
2019-12-01 | Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail |
FINE-2 | participant | 3.635.175 | 14 |
2019-12-01 | Advanced signalling and automation system - Completion of activities for enhanced automation systems, train integrity, traffic management evolution and smart object controllers |
X2Rail-4 | participant | 17.900.873 | 20 |
2019-12-01 | System architecture and Conceptual Data Model for railway, common data dictionary and global system modelling specifications |
LINX4RAIL | participant | 2.155.092 | 16 |
2019-12-01 | Intelligent Innovative Smart Maintenance of Assets by integRated Technologies 2 |
IN2SMART2 | participant | 10.241.024 | 21 |
2019-10-01 | Performance Improvement for Vehicles on Track 2 |
PIVOT2 | participant | 17.845.062 | 16 |
2019-09-01 | Smart data-based assets and efficient rail freight operation |
FR8RAIL III | coordinator | 5.804.576 | 14 |
2019-06-01 | VertIcal demos over Common large scale field Trials fOr Rail, energy and media Industries |
5G-VICTORI | participant | 13.499.491 | 27 |
2019-05-01 | PReparedness against CBRNE threats through cOmmon Approaches between security praCTItioners and the VulnerablE civil society |
PROACTIVE | participant | 4.970.029 | 16 |
2018-12-01 | Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication |
X2Rail-3 | participant | 17.166.487 | 19 |
2018-11-01 | Research into enhanced track and switch and crossing system 2 |
IN2TRACK2 | participant | 13.188.021 | 28 |
2018-10-01 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2. |
CONNECTA-2 | participant | 4.305.179 | 6 |
2018-09-01 | IP1 Traction TD1 and Brakes TD5 – Phase 2 |
PINTA2 | participant | 12.680.591 | 10 |
2018-09-01 | Smart Planning and Virtual Certification |
PLASA-2 | coordinator | 823.644 | 7 |
2018-05-01 | Digitalization and Automation of Freight Rail |
FR8RAIL II | participant | 5.461.568 | 17 |
2017-10-01 | Performance Improvement for Vehicles on Track |
PIVOT | participant | 7.746.802 | 17 |
2017-09-01 | Innovative Solutions in Future Stations, Energy Metering and Power Supply |
IN2STEMPO | participant | 5.972.727 | 19 |
2017-09-01 | Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 2 |
IMPACT-2 | participant | 3.153.653 | 14 |
2017-09-01 | Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions |
X2RAIL-2 | participant | 13.399.917 | 19 |
2017-09-01 | Real time information applications and energy efficient solutions for rail freight |
FR8HUB | participant | 4.400.000 | 14 |
2016-09-01 | Smart Planning and Safety for a safer and more robust European railway sector |
PLASA | coordinator | 349.454 | 6 |
2016-09-01 | Automated Rail Cargo Consortium: Rail freight automation research activities to boost levels of quality, efficiency and cost effectiveness in all areas of rail freight operations |
ARCC | coordinator | 1.600.000 | 5 |
2016-09-01 | Start-up activities for Advanced Signalling and Automation Systems |
X2Rail-1 | participant | 18.292.473 | 20 |
2016-09-01 | Development of Functional Requirements for Sustainable and Attractive European Rail Freight |
FR8RAIL | participant | 3.478.223 | 18 |
2016-09-01 | Future Improvement for Energy and Noise |
FINE 1 | participant | 1.340.880 | 10 |
2016-09-01 | Future Freight Loco for Europe |
FFL4E | participant | 1.499.858 | 7 |
2016-09-01 | Intelligent Innovative Smart Maintenance of Assets by integRated Technologies |
IN2SMART | participant | 7.290.633 | 23 |
2016-09-01 | Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 1 |
IMPACT-1 | participant | 299.952 | 7 |
2016-09-01 | IP1 Traction TD1 and Brakes TD5 – Phase 1 |
PINTA | participant | 12.823.244 | 9 |
2016-09-01 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. |
CONNECTA | participant | 5.477.520 | 9 |
2015-05-01 | NEW DEPENDABLE ROLLING STOCK FOR A MORE SUSTAINABLE, INTELLIGENT AND COMFORTABLE RAIL TRANSPORT IN EUROPE |
ROLL2RAIL | participant | 16.000.000 | 31 |
2015-05-01 | Innovative Intelligent Rail |
IN2RAIL | participant | 17.998.546 | 54 |
2013-10-01 | Increasing Capacity 4 Rail networks through enhanced infrastructure and optimised operations |
CAPACITY4RAIL | participant | 9.890.105 | 47 |
2013-05-01 | Future Of Surface Transport Research Rail |
FOSTER RAIL | participant | 1.659.439 | 20 |
2012-09-01 | Eddy CUrrent Brake Compatibility |
ECUC | participant | 2.050.179 | 8 |
2011-11-01 | Optimal Networks for Train Integration Management across Europe |
ON-TIME | participant | 5.381.969 | 19 |
2011-10-01 | European Railway Electromagnetic Compatibility |
EUREMCO | participant | 2.144.829 | 19 |
2011-10-01 | Virtual certification of acoustic performance for freight and passenger trains |
ACOUTRAIN | participant | 2.091.220 | 15 |
2011-10-01 | Development of the Future Rail Freight System to Reduce the Occurrences and Impact of Derailment |
D-RAIL | participant | 2.998.465 | 22 |
2011-10-01 | Reduction of Suicides and Trespasses on RAILway property |
RESTRAIL | participant | 2.816.243 | 18 |
2011-10-01 | "MAINtenance, renewaL and Improvement of rail transport iNfrastructure to reduce Economic and environmental impacts" |
MAINLINE | participant | 2.972.953 | 21 |
2011-04-01 | Secured Urban Transportation - European Demonstration |
SECUR-ED | participant | 25.468.072 | 43 |
| next >> |